
few days of paving the floor
Therefore, when the purchase of wood to the eggs of all the eggs to kill. At the same time, the selection of keel, but also to have insects or bark removed out. After a few days of paving the floor, there was a sudden gap between the slats, which was due to the high moisture content before the floor laying.
Therefore, the floor in the pavement before the water content should be between 8% -13%, and after the floor should be timely oil. Sound If the floor laying technology, but hard, resulting in paved quality is not high, people will be on the floor when the sound will be heard. In view of this, in the floor pavement process,
in particular, need to pay attention to keel and the ground, floor and keel between the two whether the combination of solid, pay attention to the number and length of nails is appropriate. Even if the use of the same tree species of slats, it will also show a "face" problem. In the use of large color difference between the tree slab,
Related links:
growth opportunities for a plastic companycomposite wood processing plantplastic pergola cover